    City of Riviera – Fishing Pier

    Client: City of Riviera Beach, Florida

    The project consisted of demolition of existing structures within the project footprint, including pilings above water and the submerged installation of a 634-foot-long pier and components. Dredging of 22,000cy sand and rock was performed on the existing channel to a Lockheed Martin facility. Ferreira transported 3 miles down the Intercoastal to a designated storage disposal site.

    Ferreira also performed the removal and disposal of three large derelict barges within the Intercoastal Waterway.