• 1-908-534-8655
    • info@ferreiragroup.com

    FDOT Drainage Improvements

    Client: Florida Department of Transportation (FDOT)

    Ferreira Construction provided all aspects of construction on this FDOT drainage improvement project. Since the location is a barrier island, extensive dewatering through well point systems was required. The project was completed ahead of schedule and resulted in an FDOT rating of 96 out of 100.