• 1-908-534-8655
    • info@ferreiragroup.com

    FPL CC Fuel Dock

    Client: Florida Power & Light Company

    Ferreira’s scope of work on this project consisted of the refurbishment of the fuel oil barge unloading structure at the Cape Canaveral Energy Center (CCEC).

    Ferreira was responsible for removing the existing structure and designing a new replacement concrete foundation and support pilings. The new design had to match the original foundation dimensions. In addition, new support pilings were installed as well as new handrails for the personnel walkway.

    Ferreira worked closely with FPL to ensure the project was completed with minimum impact to the environment as well as on time and on budget.