• 1-908-534-8655
    • info@ferreiragroup.com

    Garden State Parkway P100.317

    Client: New Jersey Turnpike Authority (NJTA)

    Ferreira Construction was awarded the annual northern bridges repairs and resurfacing contract. This contract involves replacing deteriorated concrete deck slabs, spall repairs, and repair and reconstruction of deck joints at several different locations. Also included in the scope of work for this contract are header repairs, asphalt removal and resurfacing, repairs to parapets, membrane waterproofing, concrete and steel beam repairs, bridge substructure repairs, laminated elastomeric bearing replacements, temporary support of bridge stringers, erosion repairs, cleaning and repairs to bridge drainage systems, electrical work, stone masonry repairs, and maintenance and protection of traffic. These items of work are spread over 21 different structures.

    For the duration of the contract, Ferreira Construction is also responsible for providing the necessary manpower, equipment, and materials for any emergency repair situations that may arise.