• 1-908-534-8655
    • info@ferreiragroup.com

    Port Everglades Seawall

    Client: Zachary Construction

    Ferreira Construction was contracted by Zachary Construction to repair and seal
the interior walls. Ferreira Commercial hard hat divers cleaned and prepped all the interior surfaces via sub-surface media blasting; performed underwater concrete from installation to include epoxy embedded reinforcement steel; hydraulically extracted 4 feet of debris in each of the four wells, and performed a temperature and time sensitive underwater coating of all interior surfaces. This work was all completed under stringent time lines and environmental guidelines concerning endangered species and turbidity. The project was completed on time, accepted by FPL and with 0 injuries.