• 1-908-534-8655
    • info@ferreiragroup.com

    Portland – Columbia

    Client: Delaware River Joint Toll Bridge Commission

    This project included bridge deck repairs and the installation of bridge drainage troughs on the Portland – Columbia Toll Bridge.

    Specific repairs to the bridge included, the removal and replacement of specific portions of the deteriorated concrete deck. The drainage systems included the installation of a containment system and troughs.

    Ferreira completed the project on time and on budget.