    PSEG Hudson BET

    Client: PSE&G

    Ferreira Construction was awarded six separate contracts from PSEG Fossil spanning a two year period. The general services contract required Ferreira to manage and maintain the laydown yards and receive all PSEG purchased equipment and deliver to the on-site installation contractors. Under the mechanical contract, Ferreira installed 3400 lf of fused HDPE pipe for city water and fire service mains. The demolition contract included the demolition of a loaded fly ash tank and the removal and disposal of over 20,000 tons of fly ash. The soft dig contract was utilized as a requirement for any and all excavation of site to locate existing utilities by means of a vacuum truck prior to mass excavation.