    The project includes the installation of four (4) 230kV A-Frame structures, six (6) 230kV H-Frame structures, two (2) 230/26/11 kV three-phase transformers with oil containment, seven (7) 230kV dead tank breakers, twelve (12) 230kV, 4000A, double-end break disconnect switches, one (1) 230kV, 3000A, double-end break disconnect switch with ground switch, one (1) 230kV, 3000A, double-end break disconnect switch with dual ground switches, fourteen (14) 230kV single phase CCVTs, eighteen (18) 230kV surge arresters, twenty-four (24) 230kV pothead terminations, one (1) lightning masts, one (1) firewall, various bus and disconnect switch steel support structures, and 230, 26, and 11kV rigid and flex conductor, insulators, and connectors. The project was completed on schedule.