    Rigels Cove Dredge

    Client: Terragone Development Service

    Ferreira dredged 1153CY of material and disposed of it on-site. The blend material was removed and placed. Ferreira dredged and excavated the entire length of the channel, as well as building berms to support drainage of the material. Once the drainage of the material was complete, Ferreira excavated the entire area with little or no disruption to the surrounding community. The project was completed ahead of schedule and on-budget.