• 1-908-534-8655
    • info@ferreiragroup.com

    Sailfish Point

    Client: Sailfish Point Association and Country Club

    Ferreira dredged approximately 25,000 cy of the Sailfish Navigation Canal along the northern segment of Sailfish Point, an area with properties that are susceptible to a 25-year return interval storm.

    Ferreira transferred the material 1.5 miles to stabilize the eastern
ocean side segment of Sailfish Point, the result of which, will also aid in stabilizing Bathtub Beach Park, which is immediately up-drift of Sailfish Point and within the same littoral cell.

    The project will provide protection for the eastern residences and wildlife in Sailfish Point and mitigate damage from future storms.