• 1-908-534-8655
    • info@ferreiragroup.com

    St. Lucie Boardwalk

    Client: Florida DEP

    Ferreira rebuilt the entire 1+ mile boardwalk in an environmentally sensitive area. This project consisted of demolition and reconstruction of an existing boardwalk across a barrier island with zero impact to water ways, native vegetation, wildlife and surrounding environment.

    The barrier island could only be accessed by water, which had to be maintained throughout the project. Ferreira incorporated a method which delivered materials and removed demolition materials simultaneously, affording park rangers 100% access for firefighting equipment and ranger activities throughout the construction process. Ferreira Construction successfully completed this project on time.