    Tappan Zee

    Client: New York State Thruway Authority

    A portion of the New York State Thruway Authority prime contract awarded to Tutor Perini called for the replacement of the existing of the concrete movable barrier systems with a new redesigned steel jacketed movable barrier system for the entire 3 mile length of the Tappan Zee Bridge. The new redesigned movable barrier system allows for added traffic safety on the bridge, extended durability of the individual barrier units and increased available traffic lane width for vehicular traffic. The construction effort was accomplished during the winter months of 2010-2011. The work was accomplished months ahead of schedule with no changes, no claims and 100% accident free.