• 1-908-534-8655
    • info@ferreiragroup.com

    Town of Palm Beach Bridge

    Client: City of Palm Bay, Florida

    Ferreira constructed a 60-foot-long pedestrian bridge over the canal with sidewalks leading to and from the bridge. Tropical vegetation was planted to make the area look more picturesque and closer to its natural state. The canal banks were stabilized with fabric form to prevent erosion.