ALERT: Impersonation Attempts Detected: Ferreira Construction Co., Inc. (FCC) has recently detected multiple attempts by unknown actors to impersonate FCC by use of FCC’s name, address, likeness, and other information. This activity includes the use of fraudulent emails, domain names, and non-FCC telephone numbers. Please be advised that all official emails from FCC use an @ferreiraconstruction.com or @ferreiragroup.com domain. If you receive an unexpected or unusual communication purportedly from FCC or you are unsure about its authenticity, please contact FCC for verification by reaching out to info@ferreiragroup.com or by phone at 908-534-8655. Your trust and safety are our top priorities!
UTILITY PROJECTS
CIVIL
UTILITY
GAS
RENEWABLES
ELECTRICAL
MARINE
ICONIC
CIVIL
UTILITY
GAS
RENEWABLES
ELECTRICAL
MARINE
ICONIC
Roseland-Pleasant Valley Electric Transmission Project
Location:
Various locations, New Jersey
Owner:
PSEG
Year Completed:
2024
The PSEG Roseland – Pleasant Valley Project (RPV) is designed to strengthen the electric transmission system between the Roseland Switching Station in Roseland, N.J. and the Pleasant Valley Switching Station in Hopewell, N.J. The project replaces aging infrastructure in 17 municipalities, spanning 51-miles through Essex, Morris, Somerset, Hunterdon, and Mercer counties. Ferreira is responsible for the construction of 262 drilled and reinforced caisson foundations ranging from 18 to 87 feet in depth and 7 to 12 feet in diameter as well as the installation and maintenance of the access roads and work pads during operations.
TOWERS
Built 1920s – 1930s
Some of the lattice towers being replaced were built in the 1920s and 1930s