    FPL CC Gantry

    Client: Florida Power & Light Company

    Ferreira’s work on this project consisted of the design, furnish, and install of lifting equipment to facilitate connecting a fuel unloading hose from FPL’s pipe to fuel oil delivery barge located at the fuel oil barge unloading structure at the Cape Canaveral Energy Center (CCEC).

    Ferreira was responsible for designing, furnishing and installing a single monorail system with steel columns and frame. The monorail, a (20) twenty foot high steel structure consists of (2) two electrical hoist, each with a tethered hand held control able to hold a fuel hose weighing 1000 lbs carrying 4000 lbs of fuel.

    Ferreira worked closely with FPL to ensure the project was completed with minimum impact to the environment and on time and on budget.