    Jupiter Cove

    Client: Jupiter Cove Marina

    This project entailed the dredging of approximately 500 CY of sand from the marina to an elevation of -5.0’. The material was removed using a 150 cubic yard volume capacity barge. Ferreira dredged and installed a new 490 LF seawall with returns in front of the existing seawall. Ferreira worked closely with the owner and surrounding community to mitigate any disruption to the residencies in and around the project area.