    PSEG Gloucester

    Client: PSE&G

    The Gloucester substation civil construction scope consists of installation of new concrete foundations for dead-end structures, control house, reactors, circuit breakers, bus supports, and miscellaneous steel structures. It includes the installation of cable trenches, grounding and conduits throughout the substation as well as associated backfill. Some of the more notable work on the site includes but is not limited to: Thirty-four (34) low bus support F-30 foundations, seventy-six (76) switch stand F-31 foundations, twenty-seven (27) new CCVT F-32 foundations, four (4) new foundations F-33 for 2 pothead structures, fourteen (14) new A Frame H-35, and thirteen (13) new F-36 Circuit breaker foundations.