ELECTRICAL PROJECTS

CIVIL

UTILITY

GAS

RENEWABLES

ELECTRICAL

MARINE

ICONIC

CIVIL

UTILITY

GAS

RENEWABLES

ELECTRICAL

MARINE

ICONIC

Caltrans Route 210 Electrical Upgrades


Location:
Various Locations, CA

Owner:
California Department of Transportations (Caltrans)

Year Completed:
2020

The Route 210 overall project was broken into two phases which consisted of widening approximately 10 miles of the 210 freeway through the cities of La Cañada Flintridge, Glendale, and Pasadena, Ferreira Coastal the electrical subcontractor to Powell Constructors, Inc. for both phases of the project. The first phase included ramp metering, vehicle count stations, and lighting modifications in conjunction with the freeway’s widening. The second phase involved the installation of a new fiber optic communication system including mainline fiber and splicing using a rock wheel trencher, a closed-circuit television (CCTV) camera system, changeable message sign, and traffic monitoring stations along the freeway. Ferreira Coastal also installed new lighting and lighting control systems for three freeway tunnels in the Pasadena area.

Rte. 210

Foothill Freeway

State Route 210 is also known as the Foothill Freeway since it is connected to Interstate 210.

ALERT: Impersonation Attempts Detected: Ferreira Construction Co., Inc. (FCC) has recently detected multiple attempts by unknown actors to impersonate FCC by use of FCC’s name, address, likeness, and other information. This activity includes the use of fraudulent emails, domain names, and non-FCC telephone numbers.  Please be advised that all official emails from FCC use an @ferreiraconstruction.com or @ferreiragroup.com domain. If you receive an unexpected or unusual communication purportedly from FCC or you are unsure about its authenticity, please contact FCC for verification by reaching out to info@ferreiragroup.com or by phone at 908-534-8655. Your trust and safety are our top priorities!