CIVIL PROJECTS

CIVIL

UTILITY

GAS

RENEWABLES

ELECTRICAL

MARINE

ICONIC

CIVIL

UTILITY

GAS

RENEWABLES

ELECTRICAL

MARINE

ICONIC

Carlsbad Recycled Water Pipeline Expansion


Location:
El Camino Real & Tamarack, California

Owner:
Carlsbad Municipal Water District

Year Completed:
2019

The Recycled Water Phase project enhances the treatment of waste water using additional filtration and disinfection making the water usable for irrigation and other non-drinking purposes. The segment five expansion connected customers along Navigator Circle, Ponto Drive, and Avenida Encinas with the recycled water. The expansion included 18 miles of new piping ranging in 6” to 8” in diameter and a new 1.5 million-gallon storage tank. Ferreira’s work included installation of PVC pipe via open cut method or jack and bore system needed, and site restoration upon completion.

2016

Joined AWE

The City of Carlsbad is a member of the Alliance for Water Efficiency, a North American nonprofit that advocates for efficient and sustainable use of water.

ALERT: Impersonation Attempts Detected: Ferreira Construction Co., Inc. (FCC) has recently detected multiple attempts by unknown actors to impersonate FCC by use of FCC’s name, address, likeness, and other information. This activity includes the use of fraudulent emails, domain names, and non-FCC telephone numbers.  Please be advised that all official emails from FCC use an @ferreiraconstruction.com or @ferreiragroup.com domain. If you receive an unexpected or unusual communication purportedly from FCC or you are unsure about its authenticity, please contact FCC for verification by reaching out to info@ferreiragroup.com or by phone at 908-534-8655. Your trust and safety are our top priorities!