ALERT: Impersonation Attempts Detected: Ferreira Construction Co., Inc. (FCC) has recently detected multiple attempts by unknown actors to impersonate FCC by use of FCC’s name, address, likeness, and other information. This activity includes the use of fraudulent emails, domain names, and non-FCC telephone numbers. Please be advised that all official emails from FCC use an @ferreiraconstruction.com or @ferreiragroup.com domain. If you receive an unexpected or unusual communication purportedly from FCC or you are unsure about its authenticity, please contact FCC for verification by reaching out to info@ferreiragroup.com or by phone at 908-534-8655. Your trust and safety are our top priorities!
CIVIL PROJECTS
CIVIL
UTILITY
GAS
RENEWABLES
ELECTRICAL
MARINE
ICONIC
CIVIL
UTILITY
GAS
RENEWABLES
ELECTRICAL
MARINE
ICONIC
Carlsbad Recycled Water Pipeline Expansion
Location:
El Camino Real & Tamarack, California
Owner:
Carlsbad Municipal Water District
Year Completed:
2019
The Recycled Water Phase project enhances the treatment of waste water using additional filtration and disinfection making the water usable for irrigation and other non-drinking purposes. The segment five expansion connected customers along Navigator Circle, Ponto Drive, and Avenida Encinas with the recycled water. The expansion included 18 miles of new piping ranging in 6” to 8” in diameter and a new 1.5 million-gallon storage tank. Ferreira’s work included installation of PVC pipe via open cut method or jack and bore system needed, and site restoration upon completion.
2016
Joined AWE
The City of Carlsbad is a member of the Alliance for Water Efficiency, a North American nonprofit that advocates for efficient and sustainable use of water.