GAS PROJECTS

CIVIL

UTILITY

GAS

RENEWABLES

ELECTRICAL

MARINE

ICONIC

CIVIL

UTILITY

GAS

RENEWABLES

ELECTRICAL

MARINE

ICONIC

PSEG Montclair Main Replacement


Location:
Montclair, New Jersey

Owner:
PSEG

Year Completed:
2018

PSEG contracted Ferreira to replace aging cast iron gas pipes with new, durable plastic and/or coated steel piping. The reason for the replacement was to ensure the safety and reliability of their gas system for the future. Ferreira crews were able to perform work during regular work hours without affecting the daily commuters. Ferreira was responsible for the installation of the distribution gas main using a jack and bore system in which a carrier pipe was bored under the railway tracks without any disruption of rail service and the associated product pipe was inserted into the carrier pipe replacing the existing possibly compromised facilities.

97%

Natural Gas Pipeline

Approximately 97% of natural gas distribution pipelines in the US were made of plastic or steel by the end of 2020.

ALERT: Impersonation Attempts Detected: Ferreira Construction Co., Inc. (FCC) has recently detected multiple attempts by unknown actors to impersonate FCC by use of FCC’s name, address, likeness, and other information. This activity includes the use of fraudulent emails, domain names, and non-FCC telephone numbers.  Please be advised that all official emails from FCC use an @ferreiraconstruction.com or @ferreiragroup.com domain. If you receive an unexpected or unusual communication purportedly from FCC or you are unsure about its authenticity, please contact FCC for verification by reaching out to info@ferreiragroup.com or by phone at 908-534-8655. Your trust and safety are our top priorities!