ALERT: Impersonation Attempts Detected: Ferreira Construction Co., Inc. (FCC) has recently detected multiple attempts by unknown actors to impersonate FCC by use of FCC’s name, address, likeness, and other information. This activity includes the use of fraudulent emails, domain names, and non-FCC telephone numbers. Please be advised that all official emails from FCC use an @ferreiraconstruction.com or @ferreiragroup.com domain. If you receive an unexpected or unusual communication purportedly from FCC or you are unsure about its authenticity, please contact FCC for verification by reaching out to info@ferreiragroup.com or by phone at 908-534-8655. Your trust and safety are our top priorities!
CIVIL PROJECTS
CIVIL
UTILITY
GAS
RENEWABLES
ELECTRICAL
MARINE
ICONIC
CIVIL
UTILITY
GAS
RENEWABLES
ELECTRICAL
MARINE
ICONIC
Turkey Point Recovery Well System
Location:
Florida
Owner:
Major Utility Company
Year Completed:
2018
Ferreira Southern worked as the prime contractor assisting in the remediation of a plume of saltwater pollution that leaked into South Florida’s largest source of drinking water. Ferreira Southern designed and constructed a pipe bridge with a walkway and access ladders that support a 30-inch ductile iron pipe. Additionally, Ferreira Southern installed nine deep injection wells connected by more than 48,000 linear feet of HDPE pipe. Other significant work items included the installation of an 18-inch gate valve and corresponding feeder pipe, a concrete cap, and a disconnect rack for the disconnection of the old conduit and wiring. A new start-up system was installed, and a complete site restoration was performed.
900,000
Homes
Turkey Point produces 100% carbon-free energy for more than 900,000 homes.